The color, size, or style shown in some images may differ from the description. Please carefully check the product description before placing your order.
Tsurumi Canada
Submersible pump 2/3hp 110v 2'' with float
Submersible pump 2/3hp 110v 2'' with float
Mfr. Model # 
LB-480A
|Item # 
10060377
Your price
Complete your account to see your prices.
Please fill out the form.
Couldn't load pickup availability
Please contact your JRV advisor for more information
Shipping times are based on information available at the time of ordering and are subject to change.
LB-480A Automatic Submersible Pump performs like the non-automatic version in every aspect of construction site usage requiring a tough and durable pump. No control panel or float switches required. Performs like the non-automatic pump with no special float installation required. Requires very small space to operate - only 8 3/4" diameter. Urethane, Semi Vortex Impeller and Wear Plates for maximum durability with maintaining pump performance. Oil Lifter provides lubrication of the seal faces. (Patented). V-Ring Seal Protector designs mechanical seal from abrasive particles. Environmentally friendly, reducing electrical costs and operational noise. (Technical Features of EL Relay Unit (Level Sensor)). Sensitive electrodes detect water to start pump operation even when foreign materials are present. • Internal timer eliminates frequent on/off operation in rough water to extend motor life. Relay sensor completely molded in resin and covered by rubber case for protection against rough handling. Jobsite tested for more than 30,000 on-off cycles without failure or damage.
MFR LB-480A

- Choosing a selection results in a full page refresh.
- Opens in a new window.